Article
Keeping calibration records
If you use gauges, scales, meters or torque wrenches to measure or test, you need to know whether they are suitable for the job and when they were last checked. Calibration records help you track the result and the next check date.
List the equipment that matters
List the equipment that affects your work. Record a unique identifier, where it is kept, who is responsible for it and how often it needs checking. Include personal equipment if staff use it for the job.
Record each calibration
Record the date, who checked it, the result and when the next check is due. Keep the certificate or report and mark the equipment so staff can tell whether it is current.
Act when equipment fails a check
If equipment is outside its allowed range, take it out of use. Work out what was measured since its last satisfactory check. You may need to recheck work or contact a customer. Record what you decided and why.
Do not let due dates slip
Check upcoming due dates regularly and give the person responsible time to arrange the check. This helps avoid using equipment after its calibration date has passed.
Quality Manager is intended to keep calibration details and records in one place. You can import an existing calibration list from a spreadsheet.
Planned for February 2027: try QMS free for 14 days.
This article provides general information only and is not legal or professional advice. Consider your own circumstances and get advice where needed.
More articles
- What an auditor may ask about document control
- How to record staff acknowledgements
- Prepare documents for document control
- Plan your audits before they are due
- Who should approve a work procedure
- How to tell field staff about changed procedures
- How to handle a nonconformance
- Corrective action that tackles the cause
- How to carry out an internal audit
- Make management reviews useful
- Managing risks and opportunities
- How to handle customer complaints
- Choosing and reviewing suppliers
- Do you need a quality management system?
- Policies, procedures and work instructions: what’s the difference?
- Document control for aged care and disability providers
- How often should you review your procedures?
- Moving from paper or shared drives without disrupting work
- Document control for construction and trades
- Inducting new staff on your procedures
- Quality records for manufacturers and engineering firms
- Contractor inductions: what to give contractors and what to record
- Food safety records that hold up in an inspection
- Version control without the chaos