Contractor inductions: what to give contractors and what to record
Contractors may know their trade well but not the rules of your workplace. An induction should cover what they need to know for the job, not bury them in every company policy. It should also leave a clear record of what was provided and discussed.
Match the induction to the work
Start with the work to be done, where it will happen and who else could be affected. Give contractors the relevant site rules, access arrangements, emergency information and procedures they need. Include job-specific risks and controls where appropriate. Do not assume a general induction covers every change of site or task.
Check information before work starts
Agree on the information your business needs from contractors, such as contact details, relevant licences or evidence of training where required. Check current requirements with the person responsible for the work. Do not collect documents simply because another business does so; decide why each item matters and who will check it.
Explain rather than just hand over files
Walk through the points that could affect how the contractor works. Show where instructions are kept, who can authorise changes and how to report an issue. Give people a chance to ask questions. Where the work needs a practical demonstration or supervision, a reading exercise is not enough.
Keep a useful record
Record the contractor, the site or work covered, the induction date and the version of any important procedures acknowledged. Keep other evidence only where it has a clear purpose. Decide how records will be updated when contractors return, change work or move to another site.
Review the process with supervisors
Ask supervisors whether contractors receive information in time and whether the induction matches what happens on site. Remove irrelevant material and close gaps. A short documented briefing can be more useful than a lengthy form nobody reads.
Document Controller is intended to manage current instructions and record acknowledgements against specific versions. Your business remains responsible for contractor suitability, site induction, supervision and any requirements that apply to the work.
Planned for February 2027: try Document Controller free for 14 days.
This article provides general information only and is not legal or professional advice. Consider your own circumstances and get advice where needed.
More articles
- What an auditor may ask about document control
- How to record staff acknowledgements
- Prepare documents for document control
- Plan your audits before they are due
- Who should approve a work procedure
- How to tell field staff about changed procedures
- How to handle a nonconformance
- Corrective action that tackles the cause
- How to carry out an internal audit
- Make management reviews useful
- Managing risks and opportunities
- How to handle customer complaints
- Choosing and reviewing suppliers
- Keeping calibration records
- Do you need a quality management system?
- Policies, procedures and work instructions: what’s the difference?
- Document control for aged care and disability providers
- How often should you review your procedures?
- Moving from paper or shared drives without disrupting work
- Document control for construction and trades
- Inducting new staff on your procedures
- Quality records for manufacturers and engineering firms
- Food safety records that hold up in an inspection
- Version control without the chaos